Block & Internal Parts

Service Part Rocker Arm Assembly 3052170 3047479 – Fits N14 NT855

<p><strong>Rocker Arm Assembly 3052170 3047479</strong>, replacement for Cummins N14 and NT855 series — New Aftermarket condition, assembly state</p> <ul> <li>Replace rocker arms during mid-life valve train overhaul, typically alongside pushrods, valve bridges, and camshaft lobe inspection to prevent cascading failures. Full assembly exchange is recommended over single-arm swaps when wear is detected across multiple units.</li> <li>Fits NTA855A, N14, G855, CM558, NH855, NT855, 6810, and 6910 platforms for construction, mining, agricultural, and marine applications.</li> <li>Planned maintenance replacement intervals and cross-reference verification for 3052170rx interchange reference available with shipment.</li> </ul>

Lead Time

2-5 Days

Warranty

3-12 Months

Min. Order

1 Piece

Ships To

120+ Countries

3052170 Cummins Compatible John Deere Fitment NT855 N14 rocker arm assembly Service Part Valve Train Part

Request a Quote

Response within 24 hours

Sending...

24h quotation · 2h part verification · MOQ 1 piece

Prefer instant chat? WhatsApp

Product Details

Fleet Stocking Plan — Rocker Arm Assembly 3052170 3047479 kept in regional inventory so Cummins NT855 and N14 valve trains stay on schedule instead of waiting on emergency orders.

Technical Specifications

Parameter Value
Part Number 3052170 3047479
Product Type Rocker Arm
Cross-Reference 3052170, 3052170rx, 3047479 (reference only)
Machine Fitment NTA855A, N14, G855, CM558, NH855, NT855, 6810, 6910
Brand Compatibility Compatible with CUMMINS, John Deere
Condition New Aftermarket
Assembly State Assembly
MOQ 1 piece
Warranty 3-12 months against manufacturing defects
Quality Standard ISO 9001

Application Suitability

Service Interval What to Check
Major valve adjustment (typ. 1,500–2,000 hours) Rocker arm shaft wear, bushing clearance, adjusting screw pitting
Mid-life top-end overhaul Full assembly exchange rather than single-arm swap, pushrod seat wear
Pre-failure inspection on high-hour NT855 / N14 Valve bridge contact face, cam lobe profile, pushrod tip condition
Fleet turnover or rental return servicing Rocker arm assembly service part / maintenance status across all cylinders

Why Reactive Procurement Costs More Than the Rocker Arm Itself

A planned Rocker Arm Assembly service part / maintenance cycle removes the single largest source of valve train downtime on legacy Cummins platforms.

When a fleet waits for a rocker arm to fail before ordering, the machine has already sat idle through diagnosis, parts sourcing, and shipping. In mining and heavy earthmoving, that window routinely stretches past what the component itself costs. I managed a mixed fleet of NT855-powered excavators in Indonesia, and the pattern was always the same: one failed rocker arm meant pulling the valve cover, discovering secondary wear on pushrods and valve bridges, then waiting for a second round of parts while the machine earned nothing. [NEED_CITE: heavy equipment valve train maintenance scheduling practices]

Where the Rocker Arm Sits in the Engine Service Life

The Rocker Arm Assembly sits at the top of the valve train, translating cam lobe movement into precise valve opening events. On Cummins NH855 and N14 engines, the rocker assembly is a wear-governed component — it does not fail catastrophically without warning, but its gradual degradation erodes valve timing accuracy, compression efficiency, and fuel economy over hundreds of operating hours. Treating it as a scheduled replacement item rather than a breakdown part is the difference between controlled maintenance windows and reactive firefighting.

Recognising Wear Before It Becomes a Downtime Event

Visible wear on the rocker arm adjusting screw tip and the valve stem contact pad signals that replacement is overdue. Less obvious is the linked wear on pushrod seats and camshaft lobes — components that share load paths and degrade in tandem. When a fleet inspects rocker assemblies at scheduled intervals, the decision to replace the full assembly versus a single arm becomes a data-driven call rather than a guess made with the valve cover already off. [NEED_CITE: diesel engine valve train wear progression and inspection intervals]

Reading the Specs That Matter in Service

The assembly state of this rocker arm means it ships as a complete unit — shaft, arms, bushings, and adjusting screws — which eliminates the tolerance stacking risk that comes from mixing new arms onto a worn shaft. For NTA855A and G855 applications, the assembly approach also ensures consistent valve lash across all cylinders after installation. The ISO 9001 production standard governs dimensional accuracy at the bushing bore and shaft interface, which directly controls oil film stability during high-load operation on mining trucks and construction equipment.

Rocker Arm Assembly 3052170 3047479 for Cummins NT855 N14 valve train

The Hidden Cost of Replacing Only What Broke

Swapping a single worn rocker arm on an N14 or NT855 while leaving the remaining assemblies in place often leads to a second teardown within a few hundred hours. The uneven load distribution accelerates wear on the older adjacent arms and pushes pushrod tips out of alignment. Fleet operators who commit to full assembly exchange during a planned top-end overhaul consistently see longer intervals between the next valve train intervention, while those who piece-repair accumulate repeat downtime events that compound across a multi-machine fleet. [NEED_CITE: cumulative cost of reactive versus planned component replacement in fleet maintenance]

Why Fleets Source This Assembly Through XUNPO

Own production lines and qualified sourced supply sit under a single warranty account, so a fleet stocking Rocker Arm Assembly service part / maintenance inventory for both Cummins and John Deere 6810 / 6910 platforms does not manage two supplier relationships. Eight product categories ship from one Guangzhou warehouse, meaning valve train parts, gasket sets, and seal kits consolidate into a single consignment. Minimum order of one piece lets operators validate fitment on a single machine before committing to fleet-wide stock. Cross-reference verification covers superseded numbers like 3052170rx so older machine generations remain supported. Technical staff confirm compatibility against engine serial range before dispatch.

Rocker arm assembly shaft and bushing fitment detail

Documentation & Verification

  • Commercial invoice listing part numbers 3052170 and 3047479 with engine compatibility noted
  • Cross-reference sheet mapping 3052170, 3052170rx, and 3047479 (reference only) to engine serial ranges
  • Dimensional inspection record covering shaft diameter, bushing bore, and arm pivot clearance
  • Warranty certificate covering 3-12 months against manufacturing defects
  • Packing photographs showing assembly protective wrapping before crate closure
  • HS code classification support for customs clearance in Southeast Asian and African markets

Service Interval & Stocking Guidance

  • Inspect rocker arm contact faces and adjusting screws at every valve lash adjustment event
  • Schedule full assembly exchange during mid-life top-end overhaul rather than single-arm patch repairs
  • Stock at least one complete assembly per engine platform (NT855, N14, John Deere 6810/6910) in regional stores
  • Store assemblies in original protective packaging, away from moisture and direct sunlight to prevent shaft corrosion
  • Track replacement history per machine serial number to refine stocking intervals across the fleet

Request a Stocking Recommendation

Provide your fleet’s engine models, approximate operating hours, and current valve train service history. The technical team will map compatible assembly part numbers to each platform and recommend a stocking quantity aligned with your maintenance calendar.

Frequently Asked Questions

Q: How often should rocker arms be inspected on Cummins NT855 and N14 engines?
A: Inspection should align with scheduled valve lash adjustments, typically every 1,500 to 2,000 operating hours. Check the adjusting screw tip, valve stem contact pad, and bushing clearance. If pitting or measurable wear appears on any contact surface, plan a full assembly exchange at the next available maintenance window rather than waiting for failure.

Q: What other valve train parts should be replaced at the same time?
A: When replacing the rocker arm assembly, inspect pushrods for tip wear and straightness, valve bridges for contact face erosion, and camshaft lobes for profile degradation. Replacing pushrods and valve bridges alongside the rocker assembly prevents early re-intervention caused by mismatched wear across the valve train load path.

Q: Should I replace a single rocker arm or the full assembly?
A: Full assembly exchange is strongly preferred during any planned top-end work. Installing a single new arm alongside worn neighbours creates uneven load distribution, accelerating wear on older components and shortening the interval before the next teardown. Assembly-level replacement maintains consistent valve lash across all cylinders.

Q: How many sets should a fleet keep in stock?
A: A practical baseline is one complete rocker arm assembly per engine platform in your fleet, plus one additional set for the platform with the highest operating hours. This covers an unplanned failure while a replacement order is in transit, avoiding extended machine-down periods in remote operating locations.

Q: Can I still source this part for older Cummins engine variants?
A: Yes. Cross-reference numbers including superseded references such as 3052170rx are verified against engine serial ranges before dispatch. Older NT855 and NH855 variants remain supported. Provide your engine serial number or nameplate photograph so the technical team confirms the correct assembly variant for your specific build.

Compatible Brands

CAT KOMATSU HITACHI VOLVO HYUNDAI DOOSAN KOBELCO SANY XCMG

Our parts are engineered to meet or exceed OEM specifications. Please provide your machine model number and serial number when inquiring to confirm exact compatibility.

How to Confirm Compatibility

  1. 1

    Find Your Machine Model

    Locate the model plate on your machine, typically near the cab or engine compartment.

  2. 2

    Note the Part Number

    Check your parts manual or existing part for the OEM part number.

  3. 3

    Contact Our Team

    Our technical team verifies compatibility within 2 hours. Send us the details via the inquiry form or WhatsApp.

Shipping Information

Express Shipping

DHL, FedEx, UPS -- 3-7 business days worldwide

Sea Freight

Cost-effective option for bulk orders -- 15-35 days

Real-Time Tracking

Tracking number provided after shipment. 24/7 support available.

Warranty Policy

3-12
Months Warranty

All parts come with manufacturer warranty. Duration varies by product category.

  • Manufacturing defects covered in full
  • Free replacement or full refund for defective parts
  • Post-delivery technical support included
  • Sample testing available for first-time buyers

ISO Certified Quality

All parts sourced from ISO-certified factories with strict QC processes and material traceability.

Competitive Pricing

Save 30-50% vs OEM prices without compromising quality. Transparent pricing with no hidden fees.

Fast 2-5 Day Shipping

Large Guangzhou warehouse with 10,000+ SKUs in stock. Most orders ship within 2-5 business days.

10+ Years Experience

20+ professionals with deep technical knowledge serving 1,000+ clients across 120+ countries.

24/7 Technical Support

Dedicated support team available around the clock. Part verification within 2 hours of inquiry.

Global Reach

Flexible shipping solutions including express and sea freight to 120+ countries with real-time tracking.

Need a Custom Quote?

Our technical team responds within 24 hours. MOQ 1 piece. Ships to 120+ countries from our Guangzhou warehouse.