Engine Auxiliary Components
Engine Auxiliary Components
12V Fuel Cut-Off Solenoid for DPA/DPS/CAV/Lucas – Service Part
<p><strong>7167-620B Stop Solenoid, 12V DC for DPA/DPS Diesel Injection Pumps</strong> — replacement for Lucas, CAV fuel systems across C-Series, D-Series and E-Series rotary distributor pump applications.</p> <ul> <li>Watch for erratic engine cutoff or delayed shutdown response as early wear indicators</li> <li>Replace the solenoid proactively at scheduled overhaul intervals to prevent secondary injection pump damage</li> <li>Stocking ahead avoids unplanned downtime across mixed diesel fleets</li> <li>Suggested replacement schedule documentation included with each shipment for fleet maintenance planning</li> </ul>
Lead Time
2-5 Days
Warranty
3-12 Months
Min. Order
1 Piece
Ships To
120+ Countries
Request a Quote
Response within 24 hours
Product Details
Fleet Stocking Plans — verified service intervals for DPA/DPS shutdown controls help operators schedule replacements before field failures occur.
Technical Specifications
| Parameter | Value |
|---|---|
| Part Number | 7167-620B |
| Product Type | Stop Solenoid |
| Cross-Reference (reference only) | 7167620B, 9009-049, 9009049 |
| Machine Fitment | C-Series, D-Series, E-Series diesel injection pumps; CAV DPA, DPS, DBA, DBS fuel injection pumps; Standard DPA and DPS rotary distributor pump applications |
| Voltage | 12V DC |
| Operating Temperature | -20°C to +85°C |
| Condition | New Aftermarket |
| Warranty | 6 months against manufacturing defects |
| Standard | ISO 9001 |
Application Suitability
| Service Interval | What to Check |
|---|---|
| 2,500–3,000 operating hours | Solenoid coil resistance, plunger return spring tension, terminal corrosion |
| Annual preventive maintenance | Fuel cutoff response time, wiring harness integrity, mounting flange condition |
| Injection pump overhaul | Complete solenoid assembly replacement, sealing surfaces, associated fuel lines |
| Legacy DPA/DPS units | Cross-reference verification for superseded part numbers, voltage system match |
Why Reactive Purchasing Creates Repeat Shutdown Events
A failed fuel cutoff solenoid does not just stop the engine — it signals deeper injection system wear that reactive replacement alone will not fix.
Fleet operators and rental companies consistently lose more machine availability to repeat failures than to the first breakdown. When a 12V fuel cut-off solenoid malfunctions in a DPA or DPS rotary pump, the underlying cause often involves worn valve cores, degraded seals, or contaminated fuel passages that a new solenoid cannot remedy. Replacing the solenoid as an isolated component without addressing these companion issues typically results in another unplanned shutdown within months [NEED_CITE: diesel injection pump preventive maintenance scheduling for heavy equipment fleets].
12V Fuel Cut-Off Solenoid Maintenance Across the Machine Service Life
Where This Shutdown Control Fits in Long-Term Fleet Planning
The fuel cutoff solenoid sits at the intersection of electrical control and hydraulic fuel delivery, making it a wear indicator for the broader injection system. In CAV DPA and DPS rotary distributor pumps, this 12V fuel cut-off solenoid maintenance component typically reaches end-of-service before the pump itself requires overhaul. Fleet maintenance planners who track solenoid replacement cycles can predict upcoming injection pump service events and consolidate both into a single scheduled downtime window rather than absorbing separate reactive repairs.
Recognizing Degradation Before Complete Failure Occurs
Early warning signs include delayed engine shutoff after key-off, intermittent hard starting in cold conditions, and audible clicking from the solenoid housing without positive fuel cutoff. These symptoms often appear hundreds of operating hours before the solenoid fails outright, giving fleet supervisors a planning window. When these signals emerge on legacy DPA or DBS pump applications, the prudent approach is to schedule replacement alongside seal kit renewal and fuel filter service [NEED_CITE: diagnostic indicators for diesel fuel system solenoid degradation]. Ignoring early warnings and waiting for complete failure means the machine is already down before procurement begins, compressing the decision timeline and increasing the risk of fitment errors.
Electrical and Thermal Operating Parameters
This 12V DC solenoid operates across a temperature range of -20°C to +85°C, covering most outdoor construction and mining environments where diesel power units run. The coil resistance must match the pump’s electrical architecture — installing a 24V variant in a 12V system will cause slow plunger actuation and incomplete fuel cutoff, while a 12V unit in a 24V system will burn out the coil rapidly. The operating temperature range also dictates storage conditions for spare inventory; solenoids stored in uncontrolled environments where ambient heat exceeds +85°C for extended periods may experience insulation degradation before installation.
The Cumulative Cost of Replacing Only the Coil
A common field practice is to replace just the solenoid coil when the valve core shows wear, treating these as independent failures. In reality, a worn valve core increases the mechanical load on the new coil, accelerating its failure. This piecemeal approach creates a cycle where the same pump position sees repeat solenoid replacements at intervals far shorter than the component’s designed service life [NEED_CITE: cost impact of partial component replacement in diesel fuel injection systems]. Fleet maintenance budgets absorb these repeat labor costs and continued downtime, often without tracing the pattern back to the original decision to service only the failed subcomponent rather than the complete solenoid assembly with associated seals.
Procurement Verification for Mixed Fleets
Operators managing multiple equipment generations with DPA, DPS, DBA, and DBS pump variants need cross-reference verification before ordering. The same base function ships under several reference numbers — 7167-620B, 7167620B, 9009-049, 9009049 — and not every variant fits every pump serial range. Guangzhou XUNPO Machinery Equipment Co., Ltd maintains cross-reference tables covering superseded numbers and alternate designations for these Lucas and CAV applications. Sample units can be dispatched for fitment confirmation before bulk commitment, which is particularly valuable for rental companies standardizing spare parts inventories across acquired fleets with mixed pump histories.
Documentation & Verification
- Commercial invoice listing all cross-reference numbers (7167-620B, 9009-049) with reference-only designation
- Fitment confirmation sheet matching pump serial range to solenoid variant
- Dimensional inspection record covering mounting flange pattern and terminal orientation
- Warranty terms specifying coverage period and replacement conditions
- Dispatch photographs showing anti-static packaging and reinforced box condition
- HS code documentation for customs clearance on international shipments
Service Interval & Stocking Guidance
- Schedule replacement at major injection pump service intervals or when early degradation signs appear, whichever comes first
- Inspect coil resistance and plunger return spring during routine 500-hour service checks on DPA/DPS applications
- Maintain minimum two-unit spare stock per pump variant in active fleet to cover immediate replacement needs
- Store spare solenoids in original anti-static packaging in climate-controlled inventory below +85°C ambient
- Record replacement dates and operating hours at installation to build predictive failure data across fleet
Preparing Your Fleet Maintenance Inquiry
Provide pump model designation, equipment serial numbers, and current operating hours for each unit in the planned maintenance cycle. Specify whether the requirement is for immediate replacement or preventive stock replenishment. Include any cross-reference numbers from existing inventory or previous purchase records to expedite variant confirmation and delivery scheduling.
Frequently Asked Questions
Q: How often should the fuel cut-off solenoid be replaced?
A: Replacement intervals depend on duty cycle and environmental exposure rather than a fixed hour count. Most fleet maintenance programs schedule inspection at 2,500-hour intervals and plan replacement when early degradation signs appear — typically between 3,000 and 5,000 operating hours for standard DPA/DPS applications in construction and mining environments.
Q: What symptoms indicate the solenoid is approaching end of life?
A: Watch for delayed engine shutoff after key-off, intermittent hard starting particularly in cold conditions, and audible clicking without positive fuel cutoff. These electrical and mechanical indicators usually precede complete failure, giving maintenance planners a window to schedule replacement during planned downtime rather than absorbing an unplanned shutdown.
Q: Should I replace just the solenoid or the full injection pump assembly?
A: Replace the complete solenoid assembly with seals when degradation appears, but pump overhaul is only necessary when internal wear components reach their own service limits. Replacing just the coil while leaving a worn valve core in place accelerates the new coil’s failure and creates a repeat repair cycle within months.
Q: How many spares should a fleet operator keep in stock?
A: Maintain at least two units per pump variant actively running in your fleet. This covers immediate replacement for the first failure and provides a buffer while the replacement unit is in transit. Rental companies and contractors operating remote sites often increase this to three or four units to account for longer resupply lead times.
Q: Can I still get replacements for older DPA/DPS pump models?
A: Yes, aftermarket supply continues for legacy CAV DPA, DPS, DBA, and DBS applications even as original brand channels thin out. Cross-reference verification ensures the correct variant ships for your specific pump serial range, and sample units can be provided for fitment confirmation before committing to bulk orders.
Compatible Brands
Our parts are engineered to meet or exceed OEM specifications. Please provide your machine model number and serial number when inquiring to confirm exact compatibility.
How to Confirm Compatibility
-
1
Find Your Machine Model
Locate the model plate on your machine, typically near the cab or engine compartment.
-
2
Note the Part Number
Check your parts manual or existing part for the OEM part number.
-
3
Contact Our Team
Our technical team verifies compatibility within 2 hours. Send us the details via the inquiry form or WhatsApp.
Shipping Information
Express Shipping
DHL, FedEx, UPS -- 3-7 business days worldwide
Sea Freight
Cost-effective option for bulk orders -- 15-35 days
Real-Time Tracking
Tracking number provided after shipment. 24/7 support available.
Warranty Policy
All parts come with manufacturer warranty. Duration varies by product category.
- Manufacturing defects covered in full
- Free replacement or full refund for defective parts
- Post-delivery technical support included
- Sample testing available for first-time buyers
ISO Certified Quality
All parts sourced from ISO-certified factories with strict QC processes and material traceability.
Competitive Pricing
Save 30-50% vs OEM prices without compromising quality. Transparent pricing with no hidden fees.
Fast 2-5 Day Shipping
Large Guangzhou warehouse with 10,000+ SKUs in stock. Most orders ship within 2-5 business days.
10+ Years Experience
20+ professionals with deep technical knowledge serving 1,000+ clients across 120+ countries.
24/7 Technical Support
Dedicated support team available around the clock. Part verification within 2 hours of inquiry.
Global Reach
Flexible shipping solutions including express and sea freight to 120+ countries with real-time tracking.
Related Products
More parts you might need
Engine Auxiliary Components
12V Starter Motor AT318141 for Yanmar & John Deere – Service Part
View DetailsEngine Auxiliary Components
12V Starter Motor 25-098-11 for Kohler Engines – Service Part
View DetailsNeed a Custom Quote?
Our technical team responds within 24 hours. MOQ 1 piece. Ships to 120+ countries from our Guangzhou warehouse.